Plan EVT / DVT / PVT
Stage gates & build readiness

NPI & Pilot Launch
We help hardware teams plan EVT, DVT, and PVT builds, coordinate samples and pilot runs, set up production test flow, and close critical issues before larger production begins.
Stage gates & build readiness
Samples, fixtures & test setup
FAI, root cause & launch readiness
NPI Build Management Services
Explore China-side NPI services that keep EVT, DVT, PVT, sample builds, test setup, and production readiness moving with clear owners and evidence.
03.01
Define what each build must prove, how many units to run, who owns each gate, and which open issues block the next stage.
Learn More
03.02
Track sample versions, material readiness, factory questions, engineering feedback, and design or process issues through each iteration.
Learn More
03.03
Coordinate the first controlled small-batch run, monitor line readiness, surface assembly blockers, and report whether the build can continue.
Learn More
03.04
Turn lab checks into repeatable factory tests with fixtures, firmware flashing, pass/fail criteria, data logs, and failed-unit isolation.
Learn More
03.05
Confirm the reference unit, approved deviations, inspection limits, and acceptance records before later builds become hard to dispute.
Learn More03.06
Keep build issues out of scattered chats by tracking impact, owner, containment, root cause, corrective action, validation, and closure date.
Learn More
03.07
Check process stability, SOPs, trained operators, calibrated fixtures, material coverage, yield, packaging, capacity, and unresolved risks.
Learn More
03.08
Verify packaging, labels, serial numbers, accessories, manuals, warning marks, and shipment records so accepted units can travel cleanly.
Learn More