Why This Is Needed
Teams often move from pilot to production because the schedule demands it, not because the evidence supports it. If operators are not trained, fixtures are not calibrated, yield is unstable, or open issues remain unresolved, production scale will amplify every weakness.
What FactoryFrontier Does
- Review SOPs, work instructions, operator training, fixture calibration, process parameters, and test records.
- Check material coverage, supplier readiness, packaging readiness, capacity, and line scheduling.
- Evaluate yield stability, defect trends, rework levels, and unresolved issue impact.
- Decide whether the factory is ready to ramp, needs containment, or should repeat pilot build.
What You Receive
- Production readiness review report.
- Ramp readiness checklist.
- Open-risk and blocking issue summary.
- Go / Hold / Repeat pilot recommendation.
How This Helps
Disciplined scaling prevents shipment pressure from being mistaken for evidence of readiness.