Why This Is Needed
Factories quote what they can see. If CAD files, BOMs, sketches, test expectations, tolerances, or appearance requirements are unclear, suppliers will fill the gaps with their own assumptions. Those assumptions later become cost disputes, tooling mistakes, rework, and delayed pilot builds.
What FactoryFrontier Does
- Organize CAD, drawings, BOM, prototype photos, specifications, and design intent into a supplier-ready structure.
- Translate engineering requirements into bilingual manufacturing language for Chinese suppliers.
- Clarify ambiguous requirements around materials, tolerances, finish, packaging, testing, and acceptance criteria.
- Flag missing information before RFQ or sample build begins.
What You Receive
- Manufacturing Requirements Translation Pack in English and Chinese.
- Supplier-ready requirement summary.
- Open-question and assumption log.
- RFQ and build-readiness checklist.